Home › Forums › Technical Support › Wood Finishing › finish drying problems over minwax stain?
Tagged: MainTopics
- AuthorPosts
HI,
I have just sanded a 1940’s red oak floor, 40, 60, 100. edged 60 100 and screened with 120, water popped, Then applied red mahogany minwax with rags. Waited 2 days, seemed to be dry. applied 1 coat of poloplaz and has been 30 hrs and still tacky? I turned heat on after about 24 hrs and have fans running. Anything else i can do to speed this along? I have never had this happen before. I can normally buff and 2nd coat after about 12-16 hrs at the most..
please help
I did not find the right solution from the internet.
References:
https://www.woodfloorbusiness.com/floormasters/viewtopic.php?f=1&t=9294
[url=https://jobs.vidzzy.com/hire-creative-video-production-service/]Creative video production service
[/url]Thanks!
HI,
I have just sanded a 1940’s red oak floor, 40, 60, 100. edged 60 100 and screened with 120, water popped, Then applied red mahogany minwax with rags. Waited 2 days, seemed to be dry. applied 1 coat of poloplaz and has been 30 hrs and still tacky? I turned heat on after about 24 hrs and have fans running. Anything else i can do to speed this along? I have never had this happen before. I can normally buff and 2nd coat after about 12-16 hrs at the most….
Please help.
I didn’t find the right solution from the Internet.
References:
https://www.woodfloorbusiness.com/floormasters/viewtopic.php?f=1&t=9294
[url=https://jobs.vidzzy.com/hire-product-video-production-company/]Product video production[/url]Thanks!
- AuthorPosts
- You must be logged in to reply to this topic.